OUR PROJECTS

NEUQUIN WINDS WIND FARM
80 MW - Neuquén - Argentina - J. CARTELLONE SA - 2018
Preparation of Basic Engineering of civil works.
100 MW - SCM CONSULTORA / AES ARGENTINA / ACCIONA 3.5MW HH120m - 2019 -
Review of the Executive Engineering of the Foundations of the Project's wind turbines. Preparation of the Executive Project of Roads and assembly platforms.

LOMA BLANCA WIND FARM
Trelew - Chubut - Argentina
LB I and LB II - 100 MW - POWERCHINA - 2019
-
Optimization of the Executive Project of Roads and assembly platforms. Construction plans. Technical supervision.
LB VI - 100MW - POWERCHINA - 2019
-
Preparation of the Executive Project of Roads and assembly platforms. Construction plans. Technical supervision.

SOLAR PARK CORDILLERA SOLAR
San Juan - Argentina
ISASTUR ISOTRON - 2019
-
Control Building Design - 150 m2 - Guañizuil II (Executive Project)
-
Design of SET Team Foundations - (Executive Project)

SOLAR PARK CORDILLERA SOLAR
San Juan - Argentina
TYPSA GROUP - 2018
-
Building Design - 610 m2 - 80MW (Executive Project)
-
Architectural Design, Structural Design, Electrical and Sanitary Installations
